Baseline Formula
MRT
((weekly volume x mins/item x friction factor x 52) / 60) x blended hourly rate
electri | iHub // Permanent Business Automation Infrastructure
TYPE: Public Surface // STATUS: Browseable // INFRASTRUCTURE: iHub Verified
Simulation Protocol: Review the Shadow Payload before execution.
Tools / Manual Review Tax
A fast executive model for estimating operational drag, recoverable time, and expected lift from deterministic orchestration.
Use this model to baseline current workflow drag before deploying automation lanes. The formula intentionally stays transparent so leadership can challenge assumptions in plain language.
Baseline Formula
MRT
((weekly volume x mins/item x friction factor x 52) / 60) x blended hourly rate
Reference Rate
$85/h
Default blended rate for strategic ops, compliance review, and handoff overhead.
Friction Factor
1.2-1.5x
Apply higher factors where multi-system handoffs and manual policy checks dominate.
Executive Diagnostic
Quantify friction, recovery potential, and operating drag in under two minutes with a deterministic baseline model.